JMPE Electrical Engineering Lighting Design
bulb
Home
About JMPE
John Maloney
Staff
Projects
Awards
What's New
Links
Make a Payment
Contact Us

156 West Alamar Avenue, Suite B
Santa Barbara, CA 93105
Ph: (805) 569-9216 • Fax: (805) 569-2405

5500 Ming Avenue, Suite 251
Bakersfield, CA 93309
Ph: (661) 831-7851 • Fax: (661) 831-7813

127 West Clark Ave., Suite 204
Orcutt, CA  93455
Ph: 805-886-1390

e-mail: maloney@jmpe.net

JMPE Lighting & Electrical Engineering Projects

Industrial commercial | government | schools | industrial

conduits
Conduits at wall

sanford
Sanford Winery Barrel Room

Conduits
Conduit rough-in before a concrete pour.

GE Fanuc
Inamed
Ocean Networks
Raytheon
Sanford Winery
Windsor Court Hotel,
  New Orleans
Wyatt Technologies


Windsor
Windsor Court Hotel-New Orleans Generator (on platform 20 feet above flood level)

switch
Open Switch Gear

Conduits
The conduits are properly supported and the transition to the vertical stub-ups are wrapped rigid conduit. Conduit routes were planned and installed to support control wiring and power to each of the units to be installed on the finished pad. When complete, the chiller and it's peripheral devices will all be interconnected and powered up.

commercial | government | schools | industrial